Skip to content

CASE STUDY

A Branch Network Refresh Across Two Onsite Visits

A branch in Rocklin needed a network refresh spanning equipment replacement, cable work and a follow-on cutover. Two work orders formed one site project.

The recorded onsite work included removing the old rack, installing a 48-port switch, firewall, FlexEdge device and two access points, and completing cable runs. The follow-on visit covered the cutover and packing retired equipment.

Provider closeouts describe wired and wireless tests and verification with site and remote contacts. The project record connects the equipment installation with the cutover and the preparation of the retired devices for return.

Bring your next project into the conversation.

Tell us what is changing, where and when. We’ll review the onsite work with your team.