CABLING & RACK SERVICES

Get cabling and racks ready for your next site change.

Add network connections, install rack equipment or organize an existing IT closet. ALL I.T. handles the physical cabling and rack work around your site plan, with the labels and test records your team needs to use it.

  • ✓Cabling planned around your site requirements
  • ✓Rack equipment installed to your layout
  • ✓Labels that help your team trace connections
  • ✓Testing matched to the agreed scope
  • ✓Photos and records for the completed work

What needs connecting or organizing?

Share the site, quantities and testing requirements you already know. We can review plans or photos with you in follow-up.

Build the connections the equipment depends on.

A new device may need a cable run, a patch-panel connection or a place in the rack. Plan those physical details together so the installation supports the equipment and locations in your design.

Routine Physical Inspections icon min

Data cable installation

Install specified Cat5e, Cat6 or Cat6A runs, outlets and patch-panel connections.

office changes min

Termination and repair

Terminate or repair the agreed connections and carry out the specified checks.

hardware installation icon min

Labels and port records

Identify outlets, cables and ports using the labeling and record format your team needs.

image 7

Rack-and-stack

Mount equipment to the approved layout and reconnect identified network and power leads.

wireless

Rack and closet organization

Arrange patch leads, labels and equipment around the target layout and permitted downtime.

network equipment

Fiber work

Plan patching, installation, termination, splicing or testing with the specialist resources required for the task.

Leave the site easier to support.

Connect the right locations

Start with what needs connecting and where it will sit. The installation can then account for endpoints, routes, materials and building access, rather than treating the cable run as an isolated job.

Make the next connection identifiable

Labels should be useful after the installer has left. Define the outlet and port information your team needs so later support or equipment changes can use the installation record.

Choose the right verification

Different checks answer different questions. If the job needs cable certification, include the required standard and report during planning so the assignment has the appropriate test equipment and resources.

Fit the work around the site

Existing closets may have unknown connections or limited access. We review the intended layout and authorized service window, and identify where tracing or a survey is needed before the work can be finalized.

Plan the physical work around the building.

We coordinate the installation assignment with your technical and site contacts. Routes, materials, lifts, permits and building responsibilities are worked through where the job requires them.

How the work comes together

1. Share the connections or layout

Tell us what needs installing or organizing. Include plans, quantities, photos and testing requirements you have.

2. Install and identify

We carry out the agreed cabling or rack work, with the labeling and site arrangements established for the assignment.

3. Review the handover

Use the installation details, specified test results and remaining items to support the next stage of work.

For MSPs

Add cabling and rack capacity for client sites using your technical specifications. We agree site contact and the installation records your MSP needs for the client handover.

Frequently asked questions

Is cable certification included?

It can be included when specified, with the required standard, suitable test equipment and report. A continuity check provides a different level of verification.

Can you organize an existing rack?

Yes. The work is planned around the target layout, known connections and downtime permissions. Unidentified connections may need tracing before changes can proceed.

Can this be combined with AP or camera installation?

Yes. Cabling and device installation can be sequenced in the same project. Electrical or structural work needs the appropriate provider and arrangements.

Plan the connections for your next installation.

Tell us where the work is and what it needs to support. We’ll review the installation requirements with you.