Move IT equipment with the preparation and site handling planned together. ALL I.T. handles the agreed inventory, labeling, disconnection, packing and receiving tasks, with destination setup included where your move requires it.
Share the equipment, origin, destination and preferred timing. An initial inventory is enough to start.
A move needs more than a collection date. The people handling the equipment need to know what is moving, what goes with it and where it belongs when it arrives.
Identify the equipment, accessories and assigned destinations included in the move.
Record the positions and connections your team needs for removal and reconnection.
Carry out authorized physical removal during the agreed service window.
Prepare equipment using the handling materials and requirements specified for the move.
Record quantities, visible condition and the carrier or site handoffs included in the assignment.
Unpack, position, re-rack or reconnect equipment to the supplied layout when included.
Equipment can be ready to leave while its destination still needs preparation. We coordinate the site work around the move plan, including origin access, receiving arrangements and the physical setup needed at the destination.
The equipment list should account for the items that need to arrive together. Labels, accessory records and destination details help the teams handling the move understand what belongs where.
Records at the included handoff points give your team a basis for reconciling the move. Missing items, visible damage observations or other exceptions can then be assigned for follow-up.
Destination work should follow the target layout and the technical restart plan. Re-racking and reconnection can be coordinated with the people responsible for system startup and application checks.
We coordinate the agreed physical work and site handoffs. Your system owners authorize shutdown and direct startup and validation. Transport, specialist handling and any cross-border requirements are defined for the move.
Tell us what is moving, where it is going and the required timing. We review the handling and site tasks with you.
We carry out the agreed physical tasks and record the collection or receiving stages included in the assignment.
Review equipment received and any discrepancies, with reinstallation or reconnection carried out where included.
Arrange field handling at your client’s origin and destination through one delivery contact. Your MSP retains the account and technical move plan, with site communication and reporting agreed before work.
It can be included in the proposal. Carrier booking, packing, receiving, liability and the handoff responsibilities are defined for the move.
Yes. Provide the target layout and instructions. We coordinate the physical reconnection with your remote team and the planned startup and checks.
Physical equipment moves and application or cloud migration need different work plans. Technical migration tasks require their own resources and acceptance criteria.
Tell us what needs moving and which locations are involved. We’ll review the physical tasks and handoffs with you.