At a Boston office, IT equipment needed to be disconnected and packed for return to the organization’s support team. The assignment used an equipment list and included checking items that were not on it.
The invoice’s technical resolution records check-in with the site and support contacts, completion of the decommissioning and packing list, and verification before departure.
A separate Highlands Ranch assignment covered removal and packing of a firewall, switches, access points, cameras and a UPS, followed by the return-shipment step.
