A four-day structured-cabling assignment brought wall and data outlets, a 48-port panel and connection testing into one site scope.
The ticket-specific closeout review describes installed outlets and the panel, together with tests on numerous port and access-point cable connections. The team collected the onsite evidence before final closeout.
