CASE STUDY
A restaurant assignment combined a 100-foot Cat6 run, receipt printer, mini-PC and phone setup, followed by a test print and phone call.
Read case study →: Restaurant Equipment Setup With a New Cat6 RunCASE STUDY
Onsite network deployment at three branches, with provider-reported completion, connection testing and photos supplied to the IT team.
Read case study →: Network Deployment Across Three Branch LocationsCASE STUDY
Two separate office IT decommissioning assignments covered equipment removal, packing and preparation for return to the support team.
Read case study →: Decommissioning and Packing Office IT EquipmentCASE STUDY
A UPS replacement visit combined device reconnection, retired-equipment removal, hard-drive removal and return-shipment tracking.
Read case study →: Replacing a UPS While Removing Retired EquipmentCASE STUDY
An onsite technician re-terminated faulty cabling and checked restored access-point connectivity with the MSP’s support team before departure.
Read case study →: Repairing a Cable Termination to Restore an Access PointCASE STUDY
A branch refresh covered a switch, firewall, two access points and cabling, followed by a cutover, connection tests and retired-equipment packing.
Read case study →: A Branch Network Refresh Across Two Onsite VisitsCASE STUDY
An onsite server assignment combined processor replacement, rack installation and console checks with an MSP’s remote support team.
Read case study →: Onsite Server Installation With an MSP’s Remote Team