Onsite IT site readiness checklist

Confirm that a location is ready for the planned work before booking or releasing an onsite visit. This worksheet gives the site contact, IT owner and delivery team one place to record the evidence and unresolved dependencies.

Free, two-page working form in editable DOCX and fillable PDF. Separate fictional examples. No form required.

Download the working files

Choose the blank format for your assignment. The separate filled examples are fictional and show how to keep an unresolved condition and release decision visible.

Save a working copy. Reopen the saved PDF to check the values and print preview. Use continuation pages or the Word version when more space is needed; keep the same project, site and visit references.

What the worksheet helps you decide

A visit can be scheduled while important prerequisites are still unknown. A delivery confirmation does not establish that the right equipment is available at the site. An access window does not establish that someone can open the required room.

Use the checklist to make one of three decisions: proceed, proceed with an explicitly limited scope, or resolve the blocker and reschedule. The decision belongs to the person authorized for the assignment.

Check the conditions that affect the work

  • Scope and equipment: identify the authorized task, affected devices and whether the equipment and accessories are present and accessible.
  • Entry and physical conditions: confirm the site contact, room access, approved position, pathways, power and connection points relevant to the task.
  • Instructions and technical direction: identify the current runbook, diagrams or port maps and the person available for configuration or remote guidance.
  • Window and decisions: confirm the work window, conditions that require a pause, and who can authorize a change or rollback.
  • Completion evidence: agree the permitted records, checks and person responsible for reviewing the result.

The PDF has room for the confirmed evidence, the unresolved condition and the next action with an owner. Record when the readiness check was made; conditions can change between planning and the visit.

How to use it

  1. Start one record per location and planned assignment. Name the technical owner and site or access contact.
  2. Ask the person closest to each condition to confirm it. Distinguish a verified fact from an assumption.
  3. Assign each unresolved condition to an owner with a specific next action.
  4. Have the authorized owner make the readiness decision and communicate any limited scope before the visit.

An example of an unresolved prerequisite

Illustrative example: the carrier reports that a replacement switch was delivered, but the site contact cannot locate the box. Equipment readiness remains unconfirmed. Assign someone to find and identify it before treating the installation as ready.

This is a planning example, not a reported customer event. Do not put passwords or access secrets in the worksheet. Reference the agreed access process instead.

Connect readiness to the rest of the assignment

Once the visit is ready, agree what will be returned in the onsite completion record. For several locations, track separate readiness and visit statuses in the rollout location tracker.

If the site needs investigation before its scope can be confirmed, review site surveys and assessments. Find all four downloads in planning templates.